56 results
6-K
EX-99.1
PAM
Pampa Energia SA
8 Apr 24
Current report (foreign)
6:09pm
Plus, (iii) lower revenues from recognition of own fuel due to moderate temperatures and the favorable hydro and nuclear supply, which impacted … the closing to combined cycle13, hydro generation resulting from the increase in water inputs, and wind generation associated with VAR’s acquisition and PEPE
6-K
EX-99.1
PAM
Pampa Energia SA
6 Mar 24
Current report (foreign)
4:30pm
22 and -5% vs. Q3 23), and US$2.0 thousand per MW-month for hydro (-6% vs. Q4 22 but +11% vs. Q3 23). However, capacity remuneration for CCGTs … than Q3 23).
Power generation's
key performance indicators
Variation
Hydro
Wind
Thermal
Total
Hydro
Wind
Thermal
Total
Hydro
Wind
Thermal
Total
6-K
EX-99.1
PAM
Pampa Energia SA
8 Nov 23
Current report (foreign)
3:35pm
Hydro
Wind
Thermal
Total
Hydro
Wind
Thermal
Total
Hydro
Wind
Thermal
Total
Installed capacity (MW)
New capacity (%)
Market share (%)
Nine-month period … 19
Appendix
4.1
Power generation’s main operational KPIs
Power generation's
key performance indicators
Hydroelectric
Wind
Subtotal
hydro
+wind
6-K
EX-99.1
PAM
Pampa Energia SA
9 Aug 23
Current report (foreign)
4:54pm
in Q2 23 (-374 basis points vs. 97.3% from Q2 22).
Power generation's
key performance indicators
Variation
Hydro
Wind
Thermal
Total
Hydro
Wind …
Thermal
Total
Hydro
Wind
Thermal
Total
Installed capacity (MW)
New capacity (%)
Market share (%)
Semester
Net generation (GWh)
Volume sold (GWh)
Average
6-K
EX-99.1
vc5pj
10 May 23
Current report (foreign)
5:13pm
6-K
EX-99.1
4akjj
10 Apr 23
Current report (foreign)
7:08pm
6-K
EX-99.1
hhqd3ilcp6ur p4
7 Nov 22
Current report (foreign)
5:01pm
6-K
EX-99.1
pjncoj0jyt esyvb
11 Aug 22
Current report (foreign)
4:40pm
6-K
EX-99.1
pp3cx62x5t2pf8g
12 May 22
Current report (foreign)
4:13pm
6-K
EX-99.1
b3bwdy2 ry
19 Apr 22
Current report (foreign)
5:31pm
6-K
EX-99.1
tdw g3okhatqhtf
10 Mar 22
Current report (foreign)
4:31pm
6-K
EX-99.1
c2zyk q71
10 Nov 21
Basis of presentation
4:22pm
6-K
EX-99.1
fwbruahvfxmm
11 Aug 21
Basis of presentation
5:18pm
6-K
EX-99.1
6hwatf84fvjtfyq1tj9
23 Jun 21
PAM20210622_6K
4:21pm
6-K
EX-99.1
42m 082m2anv
12 May 21
Current report (foreign)
5:05pm
6-K
EX-99.1
hiieq30 a9c593jfbi
5 Apr 21
Current report (foreign)
4:46pm